Quarry of Goro Nickel
Pont des Français – 98809 MONT DORE
BP 1743 – 98874 MONT DORE
NOUVELLE-CALEDONIE
Tel : (+33) 687 43 20 32
Fax : (+33) 687 43 20 90
carrieregoro@audemard.com
PRESENTATION
Located in the southern most end of the grande Terre, this operation has been here since 2005. Its powerful crushing facility, with a capacity of 400 tons/hour enables needs for peridotite materials to be met for the construction of a metallurgic factory in Goro.
This system is supplemented by two mobile facilities with a unit capacity of 200 tons/hour each.